Home » Commercial » Case studies
  • Infrastructure

Enhanced DNAPL coal tar extraction using geopolymer material

Summary Geobear recently worked on an innovative scheme to use our expanding geopolymer resin to enhance, pump and treat the removal of DNAPL coal tar from a sub-surface gas holder, whilst simultaneously stabilising the holder backfill and encapsulating the residual coal tar remaining in-situ. The approach, designed and implemented by Environmental Reclamation Services as Principal […]

  • Infrastructure

Listed Wall protected by Geobear

Listed Wall Protected by Geobear Cannon Hill, located off the main Finchley Road in Camden is situated to the north of the City of London. Although it has undergone considerable change in recent years the area still retails many historical features and its housing is typical of many London suburb, consisting of many 1920s and […]

  • Commercial
  • Public buildings

Ground improvement at York Hospital

Increasing the load-bearing capacity of concrete slabs for York Hospital Work to build a brand-new endoscopy unit at York Hospital is now underway, and when complete will be one of the most modern and largest endoscopy units in England. It is a £10 million project that is expected to take around a year to complete […]

  • Infrastructure

Void filling – Bermondsey Dive Under

Geobear was contracted by Skanska to design a solution for void filling between a new railway box structure and existing railway viaduct near Bermondsey. The box structure, called the Bermondsey Dive Under, was designed and introduced to provide grade separation between the Kent and Thameslink lines, which would enable the continual operation of the two […]

  • Infrastructure

Stabilising Cofferdam Installation for United Utilities

United Utilities Group PLC is the UK’s largest listed water company and was founded in 1995 as a result of a merger between North West Water and NORWEB. The group manages the regulated water and waste water network in North West England, which includes Cumbria, Cheshire, Greater Manchester, Lancashire and Merseyside – some 7 million […]

  • Roads

Road bridge abutment strengthening and void filling

Geobear was contracted by Kier to provide void filling and stabilisation services to a road bridge over a mainline UK railway. Visual structural surveys indicated a sinking surface on the abutments at both sides of the bridge. This was very problematic as the bridge runs over a busy line on the UK rail network, therefore […]

Contact Us

Please use this contact form or navigate to the contact us page and send us a message. We will respond to you within 24hrs.

Alternatively please call us on 0800 084 3503 and speak to our customer services team. Calling from Ireland please go to the contact us page.

We deliver projects on any sort of building or structure – from conservatory extension problems to 80,000m2 warehouses and road infrastructure. In most cases we will have the best solution, so get in touch today.

  • This field is for validation purposes and should be left unchanged.