Commercial floor stabilisation & re-levelling

commercial subsidence repair team

Stabilising and releveling warehouse slabs

If you have a facility floor that is sinking, we can provide a fast, non-disruptive solution.  We inject one of our expanding resins under the slab which will stabilise the existing fill material and force the slab to lift. We measure the lift to within 0.25mm ensuring automated machines are unaffected, vibration is reduced and safety is ensured.

Problems with subsidence or floor settlement pose a major problem for retail outlets and other commercial buildings. Closure of premises, loss of revenue and disruption to trading often incur costs higher than those of the repair itself. Allowing subsidence to go unchecked is a recipe for damage and potential accidents. Our advice would be to not let it get to this point.

Some less severe symptoms of ground subsidence can still have a negative impact on your business’ image. Stuff like cracks in walls and doors and windows not shutting properly will all make your business look unprofessional, which will turn off potential clients and customers, and de-motivate employees.

Geobear specialises in fast ground improvement and slab lifting which usually allow commercial premises to remain open and able to conduct their business. Geobear teams will isolate one area at a time and apply treatments to that area, enabling the remainder of the facility to operate normally.

No excavations are involved and the only drilling required is a small hole near the site of subsidence to inject the geo-polymer resin that has made us famous. Our resin will expand beneath the sunken area of your business and restore it back to where it should be. Repairs are completed in days rather than weeks or months and, in most cases, the premises can still be used by the business while the injection is happening.

Don’t let the problem get to the point where you have to pay for extensive repairs, get in touch with the friendly team at Geobear today and we’ll take a look at your site and go from there.

Geobear specialises in fast ground improvement and re-levelling which usually allow the premises to remain open. No excavations are involved, as the geopolymer is injected into the soil through small holes drilled into the floor. The expanding geopolymer first fills the voids in the soil, after which it expands and, if necessary, lifts the floor or plate back to the desired level. The geopolymer cures fast and achieves its load bearing strength within about 15 minutes. After this, even a truck can drive over the treated area.

Geobear slab lifting at a Warehouse in Enfield

Slab lifting in commercial properties is a fast, cost effective way to ensure a building is safe and fit for purpose.

Advantages

No need to vacate the site

No need to vacate the site

No loss in production

No loss in production

10 year warranty

10 year warranty

Up to 30% more economical

Up to 30% more economical

Highly recommended

Highly recommended

News

  • Residential
  • (January 31, 2019)

Stop worrying about subsidence!

When you are given the news your home has subsidence you may begin to despair. You worry that your home may collapse, that it will lose all value, that it will affect your mortgage/ home insurance policies and that it will be costly to fix. The list of worries seems endless. We at Geobear understand […]

  • Infrastructure
  • (January 24, 2019)

NCE Innovation report featuring Geobear

Geobear was recently present at a panel forum to discuss innovation in infrastructure. The panel from across industry listened to Geobear CEO Otso Lahtinen discuss the merits of geopolymer solutions in infrastructure maintenance. Read the story here

Contact us

Please use this contact form or navigate to the contact us page and send us a message. We will respond to you within 24hrs.

Alternatively please call us on 0800 084 3503 and speak to our customer services team. Calling from Ireland please go to the contact us page.

We deliver projects on any sort of building or structure – from conservatory extension problems to 80,000m2 warehouses and road infrastructure. In most cases we will have the best solution, so get in touch today.

  • This field is for validation purposes and should be left unchanged.