Geobear Customer Review – Pat Guest

Geobear Customer Review – Tracy Thacker

Customer Review – David Brookes

Customer Review – Andrew Lingham

Geobear Customer Review – Michael Oliver

Commercial / Infrastructure Testimonials

Ground improvement beneath biogas tank

Our Project required a grouting solution due to a fabrication issue that arose during installation. Other solutions quoted to us were going to take up to 5 days and required the process equipment to be shut down and isolated; meaning massive losses in production, whereas with this solution we were able to maintain the continued operation of the equipment and it was completed within a few hours. Results were more than impressive; resulting in drastic reductions in vibration and noise.

Thomas Ballard

Wall stabilisation – Berkley Group

Following concerns expressed by Hurst, Peirce + Malcolm that the Brass Foundry Wall required stabilisation Geobear successfully treated the 29m stretch of wall at our Royal Arsenal Riverside project within just 4 days. As the programme was tight I was delighted with the speed of this operation, which also represented a significant cost saving especially once you considered the cost of the prelims that Berkeley Homes would have done had we used the traditional method of underpinning. From inception through delivery they were highly professional and the result is exactly what we required.

Keith Hodgkinson

Ground improvement to accomdate mezzanine floor

The solution Geobear offered us was perfect in that it meant we could have the work undertaken without the need to move production machinery. The work itself was relatively dust-free meaning that the amount of cleaning required after the treatment was limited. The treatment itself seems to have had the desired effect in that it has allowed us to build a mezzanine structure to the timeframes that were set out. Piling would not have allowed this and would have added weeks or even months to the program. I would have no hesitation in recommending this type of solution from Geobear to another factory if they had similar challenges to ours.

Jason Rose

Floor stabilisation in busy manufacturing site

Geobear has carried out works for JMC Building and Civil Contractors at Bentley Motor Cars in Crewe, Cheshire. The work was carried out over two-night shifts and involved floor drill and grout pumping. Despite the fact that this was a main car production area the work was carried out in an extremely professional and controlled manor with no hindrance to the Client or the Clients production of High-class motor vehicles. The works areas were left clean and tidy when they had completed the works. S.W. Twigg JMC Site Manager

Jim Morton

Water bottling plant floor stabilisation

Accommodated changes in dates enforced by Client. Did the job promptly as the method statement to the client’s satisfaction. Thank you.

Richard Morris

Large commercial floor re-levelling

Fantastic support from the whole team be it design, technical or on-site. Eager to help, advise and revisit details to assure the Client.

Wayne Haywood

Residential Customer Reviews

Call Back