Home » Commercial » Case studies
  • Airports

Luton Airport – Preventative Maintenance

Geobear provided slab stabilisation to 100 slabs at Luton airport in 2018. With the expansion of operations at Luton and additional areas identified for flight traffic, in 2019, we proposed a preventative maintenance scheme of works to stabilise newly identified taxiways to be brought into use.  Background We had developed a good relationship with the […]

  • Infrastructure

Stabilisation of canal bank

Geobear provided urgent works to stabilise the bank of the Grand Western Canal running through Tiverton in the UK. The embankment had become unstable due to burrowing animals and Devon District Council needed an urgent solution.    Project background The Grand Western Canal runs across the South West of the UK and a routine inspection […]

  • Infrastructure

Void filling – Brewer Street, London

A property on Brewer Street in London included several redundant vaults used as coal sheds in the basement. The client wanted these sheds filling to secure the area and prevent deterioration. Project background Brewer Street is a busy road in central London; the client needed a solution to fill five coal sheds with minimum disruption […]

  • Residential
  • Tree Subsidence

Subsidence repairs to West London Council House

On Hilary Road in East Acton, a vacant council house was in dire need of repair and stabilisation due to subsidence at the front and rear of the property. Hammersmith and Fulham London Borough Council called in Geobear to treat the subsidence quickly and efficiently so that people could be homed in the property as […]

  • Residential

Subsidence affecting council owned property

At a council house in West London, a leaking drain had caused subsidence at the rear of the property. With a young family living inside, the issue needed to be rectified as soon as possible with minimum disruption for the tenants. Hammersmith and Fulham Borough Council used Geobear’s innovative solution to fix the subsidence in […]

  • Commercial
  • Public buildings

Re-leveling Floral Pavillion Theatre

Background The Floral Pavilion Theatre is situated in the seaside town of New Brighton on the Wirral Peninsula in England. The original building opened in 1913 and was completely rebuilt as part of the £60m Neptune Project redevelopment in 2007. Over recent years the floor slab within the main reception Plaza bar had settled causing […]

Contact Us

Please use this contact form or navigate to the contact us page and send us a message. We will respond to you within 24hrs.

Alternatively please call us on 0800 084 3503 and speak to our customer services team. Calling from Ireland please go to the contact us page.

We deliver projects on any sort of building or structure – from conservatory extension problems to 80,000m2 warehouses and road infrastructure. In most cases we will have the best solution, so get in touch today.

  • This field is for validation purposes and should be left unchanged.