project mapGeobear is regularly contracted by stakeholders concerned with the maintenance of the UK’s strategic routes to perform slab stabilisation works.

Recent projects include stabilisation to significant sections of the M54 and M42.

One of the common causes for slab failure is due to water ingress through the joints between the slabs. Overtime the water displaces the fill beneath the slab causing significant voiding; it is this voiding that enables the slab to move.

On the M42 a visual inspection by the client and subsequent inspection by Geobear indicated a clear pumping of the slabs at a in the junction 9 area as vehicles passed over them. As the frequency and weight of vehicles increases the washout of fill becomes more prevalent and results in complete slab instability.

The section of the M42 had 100 pumping slabs that ran north and southbound. To fully stabilise the slabs the options for the client were to dig out and replace or stablise through geo-polymer injection. To dig-out and replace a slab would be a very time consuming exercise taking approximately one night per slab. The Geobear injection solution meant, with two teams, we could stablise all the slabs over 20 nights, whilst other contractors followed behind latticing the joints and installing a new surface.

On the M54, the problems mirrored that of the M42, water ingress was causing pumping across ten slabs near junction 4 and degradation around the joints. Geobear was required to stabilse the affected slabs through geo-polymer injection processes.

The program of work for both projects involved injecting Geobear geo-polymer below the slabs, the geo-polymer is pumped in as a liquid and polymerises under the slab filling voids. The expansive force pushes out any water and compacts the existing fill ensuring a permanent stable base for the slab.

Our process sees 16mm holes drilled to a 350mm depth across the slab at 1.5m centres, an injection tube is placed through the hole and a Geobear technician injects the material. As material is injected, the slab is monitored using lasers – as soon as any movement of the slab is indicated the area is stabilised.

Geobear can perform this stabilisation process on slabs across all motorways, the key benefit being the speed in which we can stabilise slabs. Where required we can mobilise additional teams on projects to achieve programmes of work in quicker timescales – especially critical when the work is part of a wider scheme.

Our injection processes are a long term solution which stabilises both slabs and flexible roads; it ensures any resurfacing is installed for the long term and assets are maintained beyond original life.

Contact Us

Please use this contact form or navigate to the contact us page and send us a message. We will respond to you within 24hrs.

Alternatively please call us on 0800 084 3503 and speak to our customer services team. Calling from Ireland please go to the contact us page.

We deliver projects on any sort of building or structure – from conservatory extension problems to 80,000m2 warehouses and road infrastructure. In most cases we will have the best solution, so get in touch today.

  • This field is for validation purposes and should be left unchanged.