Home » Projects » Bath City Centre Road Slabs

work on bath city centre at night
When a GPR survey discovered voiding beneath two of the main access routes into Bath city centre, Bath and North-East Somerset council needed to find a way to stabilise the rigid construction road slabs without causing disruption to the high volume of traffic and the buildings adjacent to the roads, which included the police station and one of the Bath’s busiest nightclubs.

The aim was to strengthen weak ground under the slabs, which were already showing signs of movement/rocking, without disrupting businesses or traffic movement.

Geobear mobilised four teams to work simultaneously, allowing drilling to be completed and Geobear’s Slab Lifting polymer injection process to be applied in each location over just 8 night time shifts. Geobear undertook a full GPR survey to spot cellars and weak areas beneath the road surface before the works, and completed a post-treatment GPR survey to confirm that the soils treated had been adequately improved.

1304 sq metres of North Parade, and 1150 sq metres of Manvers Street were treated in just 8 night-time shifts. No daytime or weekend work was necessary, and there was no disruption to normal business or traffic flows.

Contact Us

Please use this contact form or navigate to the contact us page and send us a message. We will respond to you within 24hrs.

Alternatively please call us on 0800 084 3503 and speak to our customer services team. Calling from Ireland please go to the contact us page.

We deliver projects on any sort of building or structure – from conservatory extension problems to 80,000m2 warehouses and road infrastructure. In most cases we will have the best solution, so get in touch today.

  • This field is for validation purposes and should be left unchanged.