Geopolymer v Piling – a comparison
(May 10, 2019)

This short animation looks at the comparative methods of remedial work for sinking concrete slabs. The film illustrates the benefit to the customer of using Geobear’s fast, non-disruptive solutions.

 

 


In the video, we outline the differences between the two methods so that you can understand which would benefit you most. Below we overview the key statistics of each system.

Traditional piling solution:

  • This process takes from 3 to 4 weeks to remove slab, pile and new slab
  • Causes significant noise and dust, prompting considerable health and safety requirements
  • Causes major disruption to business
  • Has a potentially significant lead-in period
  • Internal and external protection works are often required
  • Waste produced must be removed to landfill
  • Produces additional delivery/collection/mobile plant considerations
  • Businesses will incur additional costs to provide temporary premises
  • Takes around 20 days with full business closure

Geobear’s solution:

  • Works can be programmed to avoid disruptions to business
  • We run a clean efficient system to prevent additional health and safety requirements
  • Is typically completed in a third of the timeframe of conventional piling methods
  • No compound requirements
  • No delivery/collection/mobile plant is necessary
  • Reduced dust, noise and health and safety requirements compared to piling
  • Guaranteed and warranted solutions to give you peace of mind
  • Significantly reduced carbon footprint
  • Takes around 8 days
  • Businesses are not required to close

CPD Request

  • This helps us allocate the appropriate presenter.
  • Town or city where you'd like the CPD presented (for online please ignore)
  • This field is for validation purposes and should be left unchanged.